Bathroom Renovation
Transform your bathroom into a luxury retreat, complete design, plumbing, tiling, and installation across Stockport and Cheshire.
At a Glance: Bathroom Renovation
- Typical cost: £6,500 to £20,000+
- Typical timeline: 2 to 6 weeks on site
- Planning permission: Not usually required
- Areas covered: Stockport, Manchester, Cheshire
- Free site survey: Yes

Your Personal Sanctuary
A bathroom renovation is one of the most rewarding home improvements. We handle every aspect, from stripping out the old suite to designing and installing a stunning new bathroom with underfloor heating, walk-in showers, and premium fixtures.
What We Create
From compact en-suites to large family bathrooms, we design and build them all.
Walk-in Shower Rooms
Frameless glass enclosures, rainfall showerheads, recessed niches, and wet-room drainage for a hotel-like experience.
Family Bathrooms
Bath-shower combinations with storage, heated towel rails, and durable finishes designed for everyday family life.
En-Suite Bathrooms
Compact, beautifully designed en-suites that maximise every inch of space. Bespoke storage and wall-hung sanitaryware.
Accessible Bathrooms
Level-access showers, grab rails, non-slip surfaces, and comfort-height fixtures. Designed for safety without compromising style.
Everything Included
Every bathroom renovation is a complete, turnkey project:

Popular Bathroom Features
The most requested features in our bathroom renovations right now.
Bathroom Renovation Costs
Indicative pricing for bathroom renovations across the Stockport and Cheshire area.

Bathroom FAQs
How long does a bathroom renovation take?
A standard bathroom renovation takes 1 to 2 weeks. More complex projects involving layout changes, underfloor heating, or wet rooms may take 2 to 3 weeks. We always complete one bathroom before starting another.
Can I use the bathroom during renovation?
Unfortunately not, the plumbing will be disconnected during the renovation. If you have a second bathroom, you can use that. If not, we plan the work to minimise the time your bathroom is out of use.
Do you supply the sanitaryware?
We can supply everything, or you can purchase your own suite, tiles, and fixtures. We're happy to advise on good quality suppliers and accompany you to showrooms if helpful.
Do I need waterproofing?
Yes, all shower and wet areas are fully tanked (waterproofed) prior to tiling. This prevents water damage to the structure and is essential for a long-lasting bathroom installation.
Frequently Asked Questions
How much does a bathroom renovation cost in Cheadle and Stockport?
Bathroom renovations in the Cheadle and Stockport area typically range from £6,500 for a refresh, £10,000 to £18,000 for a mid-spec full bathroom, and £20,000+ for luxury fit-outs with stone, underfloor heating and bespoke joinery.
How long does a bathroom renovation take?
Most bathroom renovations take 2 to 4 weeks on site. Larger en-suites and wet rooms with structural work may run 4 to 6 weeks.
Do I need planning permission for a bathroom renovation?
No, internal bathroom renovations do not need planning permission. Building regulations and Part P electrical certification apply for major works, which we manage in full.
Are you insured and FMB-accredited?
Yes. Cheadle Construction is fully insured, an FMB (Federation of Master Builders) member and TrustMark accredited, with Part P registered electricians and Gas Safe engineers.
Do you offer a free quote?
Yes. The first consultation, design ideas and on-site survey are completely free and with no obligation, followed by a clear itemised quote.